★ Regular pump control room Electrical components check.
★ Good ventilation in pump room.
★ Water treatment required for water cleaning daily.
★ Occasional replacement of spare parts like surfboards and sidewall panels.
★ Riding time: around 20-50 seconds depending on the riding experience.
★ Rounds: around 30-60 minutes.
★ Capacity per round: over 15 surfers per round.
★ Riders: 1-3 riders at the same riding.
★ We have onc experienced team for the system Insta llation, all of them has over 10 years' experience on the average.
★ For overseas projects, we send supervisors to the site and the cllents prepare the site according to our drawings and provide around 10 workers and machines such as cranes, welders etc.
★ The installation time is around 20-30 days, depending on the site condition.
★ The pool is wrapped with soft mats.
★ The system has deep water over 30cm depth or usethe flexible membrane, it will be soft falls for all ages.
★ Players are accompanied with coaches at any time.
★ Top safety considerations for every part of the system.
Leave A Message